1505-128 W Pender St, Vancouver BC

Mon - Fri 8AM - 5PM

Guardian Knight

PROJECT DETAILS
LOCATION

Vancouver, British Columbia

COMPLETION DATE

2024

SQUARE FOOTAGE

1,263

SCC Construction proudly presents the Guardian Knight office transformation at 837 W Hastings St, reflecting our commitment to modernizing work environments. With a full design-build approach, we revitalized the dated office into a contemporary, open space. Our dedication to precision, innovation, and client collaboration ensured every aspect promotes productivity and creativity. Through seamless integration of our client’s vision and our expertise, we delivered a highly functional workspace tailored to their needs.

The Guardian Knight project marked a significant transformation from a conventional office layout to a contemporary, open environment. The project commenced with the essential mobilization and site setup, ensuring all preparations were in place for a smooth workflow. Following this, we decommissioned the existing electrical systems and carried out demolition and carpet removal to make way for the new design.

The next phase involved intricate work on HVAC systems, including distribution and sensor relocation, to improve climate control and energy efficiency. Framing was completed to establish the new layout, followed by rough-ins for electrical and sprinkler systems. Key tasks such as lighting relocations and T-bar modifications were addressed to enhance the functionality and aesthetics of the office space. Inspections for electrical and framing ensured that all installations met the required standards.

95C40DF0-230D-4001-9A14-3591C5CCE82F

One of the standout features of this transformation was the incorporation of extensive glasswork. This addition not only increased natural lighting but also contributed to a more open and inviting workspace. After framing, insulation, drywall finishing, and the installation of doors and frames, the office space began to take shape. Paintwork, carpet and LVT installation, and glazing were completed to finalize the interior.

The final stages included detailed finishing touches and system completions. Electrical finishes, sprinkler final inspections, and touch-ups were conducted to ensure every detail was perfected. The project concluded with a thorough final clean, followed by the final inspection and client turnover. This approach resulted in a highly functional and aesthetically pleasing office space that supports productivity and creativity, reflecting our commitment to delivering exceptional work environments.

243BA0DF-E952-48C8-887B-0167286B93B9